Wold prepared construction documents and performed construction administration services for the removal and replacement of turf and replacement of the track at Tennessee Tech University (TTU). The stadium turf had eroded and was in poor shape. The existing 79,800 square-feet of AstroTurf was removed and replaced with new sand/rubber-infilled synthetic turf. The rubberized surface of the running track was also refurbished along with the long jump runway and D-areas. There was also 70,865 square-feet of structural spray added (running track and D-areas), including all incidentals necessary for completion.